Third Party – TVS
Year of construction: 2010
Grape Reception Tower System:
- Scharfenberger grape reception tower in autonomous steel construction.
- Can be rebuilt at another location in the same way.
- Integrated crane system for simultaneous lifting and emptying of two Breisach bins
- Inclined trough with integrated juice pre-chamber, pneumatic closure, and screw conveyor for material transport
- Catwalk with staircase and ladder for safe access to the inclined trough
- Destemming machine type AS25, optionally combinable with movable grape crusher
- Catwalks around the destemming machine for convenient cleaning and maintenance
- Two pump hoppers beneath the destemming machine with integrated scale and Oechsle measurement
- Mash transport via eccentric screw pump type SP20 to up to eleven processing targets, pipeline Ø 125 mm
- Stem disposal via retractable screw conveyor with container docking at the end
- System control
Contact:
Ms. Nicole End
E-Mail: n.end@wmfgo.de









